Switchboards

Busbars and the bus-tie, the generator, synchronising and feeder panels, what the switchboard tells you, and the emergency switchboard.

Power distribution, page 1 of 102 min readUpdated 4 November 2026All 10 pages

The main switchboard is where all the ship's power meets. Every generator feeds into it, and every large load is fed from it. It is a row of steel panels in the engine room or the engine control room, and it will be your main responsibility.

An interactive main and emergency switchboard loads here. It needs JavaScript; the sections below explain everything it shows.

Busbars

Running along the back of the switchboard are the busbars: heavy copper bars, one for each phase, that every incoming and outgoing circuit connects to. The generators put power onto the busbars through their breakers; the feeders take it off through theirs. The busbars are often split into two halves joined by a bus-tie breaker, so one half can be worked on or isolated after a fault while the other keeps running.

The panels
PanelWhat it does
Generator panelsOne per generator: its breaker, and meters for voltage, current, frequency, kW and power factor.
Synchronising panelThe synchroscope and lamps used to bring an incoming generator into step before its breaker is closed.
440 V feeder panelsBreakers for the large motors and for the distribution boards around the ship.
220 V sectionFed through transformers, for lighting and small power.
Shore connectionWhere shore power is brought in, in port or in dry dock.

The switchboard is dead front: the panels you can touch carry no live parts, only handles, meters and push buttons. The live parts are behind them.

Instruments and indications
  • Earth fault indication: lamps or an insulation monitor that show when any phase has a fault to earth.
  • Alarms: generator trips, high load, low insulation, and the preferential trip shedding loads.
  • The power management system on many ships, which starts, synchronises and stops generators as the load changes.
The emergency switchboard

A second, smaller switchboard sits in the emergency generator room, away from the engine room. It feeds the emergency loads: emergency lighting, the emergency fire pump, steering gear, radio and navigation equipment. Normally it is fed from the main switchboard through an interconnector; when that supply fails, the emergency generator starts by itself and must be on load within 45 seconds. Until then, where a transitional source is fitted (always on a passenger ship), a battery supply keeps the most vital services alive.

Check yourself
1. What are the busbars?
The heavy copper bars, one per phase, that every generator and feeder connects to.
2. What is the bus-tie breaker for?
To split the busbars into two halves, so one half can be isolated while the other keeps running.
3. What does "dead front" mean?
No live parts can be touched on the front of the panels; only handles, meters and buttons.

Going for your ETO CoC oral?

The full Switchboards notes (T04), the quiz bank and the questions MMD surveyors have actually asked, each with a model answer, are in the Elec-Buddy app.

Start your free trial

Sources

Where the figures on this page come from, by book and printed page or by regulation.

  • Hall, D.T. Practical Marine Electrical Knowledge, 3rd ed. (2014), the general scheme of a ship's power system and its main switchboard (p.1-2); the bus-tie breaker joining the two halves of the main switchboard (p.50); synchronising at the generator panels (p.61); the emergency switchboard fed through an interconnector from the main switchboard in normal operation (p.64).
  • Fernandez, E.A. Marine Electrical Technology: the emergency switchboard supplied from either 440 V feeder panel through interlocked breakers, and the bus tie (p.110); the emergency switchboard and its generator panel (p.118-119); chapter 11, switchboards and switchgear, including dead-front main switchboards (11.1.1.1, p.398).
  • Elec-Buddy notes: T04 Switchboards (busbars and bus-tie, generator and synchronising panels, dead front, earth fault indication, the emergency switchboard).
  • The lab has two 500 kW generators, a bus-tie and an emergency switchboard fed from half A. Its emergency generator is set to come on load 10 s after the emergency board loses its supply, an illustrative time inside the 45 s that SOLAS Chapter II-1, regulation 43, allows (Hall p.21 gives the same limit). The loads are illustrative too. An automated test checks its switching logic.